Corpus Christi High School | Ysgol Uwchradd Corpus Christi
Asbri Planning have been instructed by Cardiff Council to progress a Pre-Application Consultation (PAC) in respect of the proposed flood-lit all-weather 3G Pitch with a grandstand and, sustainable drainage, landscaping and other associated works at Corpus Christi High School.
In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.
All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.
Anyone who wishes to make representations about this proposed development must do so by 13th January 2026. We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.
Mae Asbri Planning Cyf wedi ei gomisiynu gan Cyngor Caerdydd i drefnu ymgynghoriad cyn gwneud Cais cynllunio llawn ar gyfer cae 3G pob tywydd arfaethedig gyda goleuadau llifogydd, gyda phrif eisteddle a draeniad cynaliadwy, tirlunio a gwaith cysylltiedig arall yn Ysgol Uwchradd Corpus Christi.
Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 13eg o Ionawr 2026. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Uned 9 Oak Tree Court, Mulberry Drive, Parc Busnes Porth Caerdydd, CF23 8RS.
Supporting Documents
Plans
Architectural
Existing and Proposed Site Sections
Spectator Stand Floor Plans and Elevations
Constraints
Drainage
Existing Drainage Infrastructure Photo and Plan
Post Development Catchment Plan
Engineering
Construction Details - Sheet 2
Landscaping
Lighting Layout
Topographical
Arboricultural
Reports
Planning Application Form - Draft
Drainage
Earthworks and Retaining Wall Assessment
Operations and Maintenance Report
Ecology
Preliminary Ecological Appraisal
Green Infrastructure
Noise
Site Investigation
Soil Survey
Appendix A Soil Resource Survey (LRA 2025)
Transport
Trees