029 2073 2652
About UsContact Us
Land at Pen-Y-Dre High School, Merthyr Tydfil / Tir ar Ysgol Gyfun Pen-Y-Dre, Merthyr Tudful

Land at Pen-Y-Dre High School, Merthyr Tydfil / Tir ar Ysgol Gyfun Pen-Y-Dre, Merthyr Tudful

1

Asbri Planning have been instructed by Merthyr Tydfil County Borough Council to progress a Pre-Application Consultation (PAC) in respect of the Proposed solar farm, cabling and associated works at Land at Pen-Y-Dre High School, Merthyr Tydfil, CF47 9BY.

In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.

All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.

Anyone who wishes to make representations about this proposed development must do so by 3rd January 2025 We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.

****

Mae Asbri Planning Cyf  wedi ei gomisiynu gan Cyngor Bwrdeistref Sirol Merthyr Tudful i drefnu ymgynghoriad cyn gwneud Cais cynllunio llawn i fferm solar, gwaith ceblau a gwaith cysylltiedig ar tir ar Ysgol Gyfun Pen-Y-Dre, Merthyr Tudful, CF47 9BY.

Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.

Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.

Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 3ydd Ionawr 2025. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Uned 9 Oak Tree Court, Mulberry Drive, Parc Busnes Porth Caerdydd, CF23 8RS.

Supporting Documents

Plans

Proposed PV Array Site Location Plan 1.2000

Proposed PV Cable Route (Sheet 1 of 4)

Proposed PV Cable Route (Sheet 2 of 4)

Proposed PV Cable Route (Sheet 3 of 4)

Proposed PV Cable Route (Sheet 4 of 4)

Proposed PV Site Layout Plan

Proposed PV Compound Details

Proposed Typical PV GRP Compound Elevations

Proposed PV Array Site Location Plan 1:1250

Landscape Plans

Site Green Infrastructure Plan

Strategic Landscape Plan

Green Infrastructure Context Plan

PV Specialist Plans

CCTV Layout

Site Layout Focussed

Infrastructure Details

PV Array

Engineer Plans

PV Array Drainage Strategy

HIAB Swept Path Analysis

Reports

Application Form

Archaeological and Heritage Desk-Based Assessment

Landscape Visual Appraisal

Tree Report

Green Infrastructure Statement

Bat and Trees Survey Report November 2024

Biodiveristy Strategy August 2024

Invertebrate Survey Report October 2022

Reptile Survey Report December 2023

Preliminary Ecological Assessment December 2023

Planning Design and Access Statement 

Previous Next