County Flats Phase2, Land east of Bevin Avenue, Sandfields, Port Talbot | Tir i`r dwyrain o Bevin Avenue, Traethmelyn, Port Talbot
Asbri Planning have been instructed by Tai Tarian to progress a Pre-Application Consultation (PAC) in respect of the proposed refurbishment of 50 existing properties, and demolition of front section of Carmarthen House and two existing houses to make way for construction of 101 new residential units with associated infrastructure works at land east of Bevin Avenue, Sandfields, Port Talbot.
In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.
All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.
Anyone who wishes to make representations about this proposed development must do so by 9th January 2026. We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Suite D, 1st Floor, 220 High Street, Swansea, SA1 1NW.
Mae Asbri Planning Cyf wedi ei gomisiynu gan Tai Tarian i drefnu ymgynghoriad cyn gwneud cais cynllunio llawn ar gyfer adnewyddiad 50 tai preswyl presennol, a dymchwel rhan flaen Tŷ Caerfyrddin a dau dŷ presennol i wneud lle i adeiladu 101 o unedau preswyl newydd gyda gwaith isadeiledd cysylltiedig ar y tir i`r dwyrain o Bevin Avenue, Traethmelyn, Port Talbot
Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 9fed Ionawr 2026. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning, Swit D, Llawr 1af, 220 High Street, Abertawe, SA1 1NW.
Supporting Documents
Plans
Architectural
Existing Site Plan - Proposed Demolition
Existing Site Plan and Site Location Plan
Existing Site Sections - Demolition
Refurbished Block
Cardigan House Proposed Front & Rear Elevations
Cardigan House Proposed Side Elevations
Carmarthen House Proposed Front & Rear Elevations
Carmarthen House Proposed Side Elevations
Coronation House Propsed Front & Rear Elevation A
Coronation House Propsed Front & Rear Elevation B
Coronation House Propsed Front & Rear Elevation C
Coronation House Propsed Side Elevations
211 Walk Up Flats
Block G and H
Block G & H First, Second & Third Floor Plans
Block G & H Fourth & Fifth Floor Plan
Block G & H Ground Floor Plans
Block G & H Proposed Elevation Materials
Block G & H Proposed Elevations Sheet 1
Block G & H Proposed Elevations Sheet 2
External Building
Bin Store 0 Floor Plan & Elevations
Bin Store 1 Floor Plan & Elevations
Bin Store 2 Plans & Elevations
Bin Store 3 Floor Plans & Elevations
Cycle Store 1 Floor Plan & Elevations
Cycle Store 2 Floor Plan & Elevations
Cycle Store 3 Floor Plan & Elevations
Mobility Scooter Store 1 Floor Plan & Elevations
Mobility Scooter Store 2 Floor Plan & Elevations
Visuals
Drainage and Engineering
Landscape
Reports
Design and Access Statement Part 1
Design and Access Statement Part 2
Design and Access Statement Part 3
Preliminary Ecological Appraisal
Updated Preliminary Ecological Appraisal.pdf
Green Infrastructure Statement
Site Investigation Report Part 1
Site Investigation Report Part 2
Site Investigation Report Part 3
Structural Viability Report Part 1
Structural Viability Report Part 2