029 2073 2652
About UsContact Us
Trostre Retail Park, Llanelli

Trostre Retail Park, Llanelli

tro

Asbri Planning Ltd. has been commissioned by Arbenigol Ltd to undertake pre-application consultation in respect of the proposed demolition of existing building on site and subsequent construction of a Class A1 Lidl foodstore, Class A3 Drive Thru Restaurant and associated infrastructure works at land adjacent to Trostre Retail Park, Llanelli. As the scheme constitutes a major development, a pre-application consultation period is required in order to provide those who may be interested in the proposals with an opportunity to view the draft application package and express their views. 

We give notice that Arbenigol Ltd are intending to submit a full planning application for the following development;

Proposed demolition of existing building on site and subsequent construction of a Class A1 Lidl foodstore, Class A3 Drive Thru Restaurant and associated infrastructure works Land adjacent to Trostre Retail Park, Llanelli

Prior to formal submission to the Local Planning Authority and in accordance with the requirements set out in Part 1A of the Town & Country Planning (Development Management Procedure) (Wales) Order 2012, the proposal will be subject to pre-application consultation.

All relevant drawings, reports and supplementary supporting documents are made available for inspection and review online below. If you are unable to access the documents electronically you may request copies of this information by emailing mail@asbriplanning.co.uk or by telephoning the applicant on 02920 732652.

Anyone who wishes to make representations about this proposed development must do so by the 8th February 2022.  We would encourage you to e-mail these to mail@asbriplanning.co.uk, alternatively please download the attached form and send them to;

Asbri Planning Ltd, Suite D, 1st Floor, 220 High Street, Swansea, SA1 1NW

Supporting Documents

Application Forms

Planning Statement

Design and Access Statement

Ecological Appraisal

Tree Report

Retail Impact and Needs Assessment

Bat Survey

Coal Mining Risk Assessment

Transport Assessment

Ground Investigation

Sequential Assessment (inc. Appendices)

Plans

SP574 - P100 Site Location Plan

SP574 - P02 Proposed Site Plan

SP574 - P02 Proposed Site Plan (Coloured)

SP574 - P01 Existing Site Plan

211209_19191_AD 113 - PROPOSED ELEVATIONS

211209_19191_AD 112 - PROPOSED ROOF PLAN

7006-4017-ZZ-XX-RP-C01-00 Trostre FCA

4017-WSP-XX-XX-RP-C-02_R00_Outline Drainage Strategy signed

4017-WSP-XX-XX-C-SK-0003 - Proposed Levels Option A Sheet 1 P02

4017-WSP-XX-XX-C-SK-0002_P04_Proposed Drainage Strategy

0072-PL-01.8-Proposed Bin Storage

0072-PL-01.7-Proposed GA Plan

0072-PL-01.6-Proposed Elevations

 

 

Previous Next