Former Ysgol Gymraeg Tan Y Lan School, Tan Y Lan Terrace, Morriston, Swansea, SA6 7DU | Hen Ysgol Gymraeg Tan Y Lan, Tan Y Lan Terrace, Treforys, Abertawe, SA6 7DU
Asbri Planning have been instructed by Dyfed Developments SPV2 Ltd to progress a Pre-Application Consultation (PAC) in respect of the proposed demolition of existing buildings and construction of 24 residential apartments with associated parking, open space and infrastructure works at the Former Ysgol Gymraeg Tan Y Lan School, Tan Y Lan Terrace, Morriston, Swansea, SA6 7DU.
In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.
All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.
Anyone who wishes to make representations about this proposed development must do so by 1st June 2026. We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Suite D, 1st Floor, 220 High Street, Swansea, SA1 1NW.
Mae Asbri Planning Cyf wedi ei gomisiynu gan Dyfed Developments SPV2 Ltd i drefnu ymgynghoriad cyn gwneud cais cynllunio llawn ar gyfer dymchweliad yr adeiladau presennol ac adeiladaeth 24 fflat preswyl gyda pharcio, mannau agored a gwaith isadeiledd cysylltiedig yn Hen Ysgol Gymraeg Tan Y Lan, Tan Y Lan Terrace, Treforys, Abertawe, SA6 7DU.
Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 1af Mehefin 2026. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Swit D, Llawr 1af, 220 High Street, Abertawe, SA1 1NW.