Asbri Planning have been instructed by Powys County Council Limited to progress a Pre-Application Consultation (PAC) in respect of the proposed Construction of a new primary school and associated works at Land at the Former Brecon High School, Penlan, Brecon, LD3 9SR.
In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.
All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.
Anyone who wishes to make representations about this proposed development must do so by 24th of December 2026.
We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.
Mae Asbri Planning Cyf wedi ei gomisiynu gan Cyngor Sir Powys i drefnu ymgynghoriad cyn gwneud Cais Cynllunio ar gyfer Datblygiad arfaethedig ysgol gynradd newydd a’r gwaith cysylltiedig ar dir yng nghyn-Ysgol Uwchradd Aberhonddu, Penlan, Aberhonddu, LD3 9SR.
Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 24ain o Dachwedd 2026.
Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Uned 9 Oak Tree Court, Mulberry Drive, Parc Busnes Porth Caerdydd, CF23 8RS.
Supporting Documents
Plans
Architectural
Proposed Bike Shelter Plans and Elevations
Proposed External Plant Compound Plans, Sections and Elevations
Proposed Bin Store Plans and Elevations
Engineering
External Works Road 1 Long Section
Transport / Highways
External Works – Vehicle Swept Path Analysis
Landscaping
Mechanical and Electrical
Topographical
Reports
Planning
Design and Access Statement
Arboriculture
Drainage and Flood Risk
Previous Ground Investigation
RSK - Preliminary Risk Assessment - July 2021
RSK - Remediation Strategy November - 2021
RSK - Phase 2 Geo-Environmental Site Investigation - August 2025
Ground Investigation
Tier 1 Geoenvironmental & Geotechnical Report - August 2026
Ecology
Preliminary Ecological Assessment
Construction Environmental Management Plan
Landscape and Green Infrastructure
Green Infrastructure Statement
Landscape and Ecological Management Plan
Heritage
Environmental Colour Assessment
Travel
Noise Assessment
Air Quality
Lighting Strategy