Asbri Planning have been instructed by Swansea Council to progress a Pre-Application Consultation (PAC) in respect of the proposed demolition of block A, B and D and construction of a new three-storey school building alongside the provision of a new all-weather pitch and MUGA, alongside improved outdoor social and recreational areas, pedestrian and cycle access, parking, landscaping, sustainable drainage and associated works at Gowerton Comprehensive School, Cecil Road, Swansea, SA4 3DL.
In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.
All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.
Anyone who wishes to make representations about this proposed development must do so by 22nd December 2026. We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Suite D, 1st Floor, 220 High Street, Swansea, SA1 1NW.
A public engagement event will be held at on Wednesday 2nd December between 10am – 1pm at Gowerton Library, Mansel Street, Gowerton, Swansea, SA4 3BU, and between 3.30pm – 7pm at Gowerton Comprehensive School, Cecil Road, Swansea, SA4 3DL. Please come along to view plans and images of the development proposals, discuss queries with members of the team and provide comments on the proposal.
Mae Asbri Planning Cyf wedi ei gomisiynu gan Gyngor Abertawe i drefnu ymgynghoriad cyn gwneud cais cynllunio llawn am ddymchweliad bloc A, B a D ac adeiladaeth adeilad ysgol newydd tri llawr ynghŷd â darpariaeth cae chwarae pob tywydd newydd a Maes Chwarae Aml-ddefnydd (MUGA), ynghyd â gwell mannau cymdeithasol a hamdden awyr agored, mynediad i gerddwyr a beicwyr, parcio, tirlunio, systemau draenio cynaliadwy a gwaith cysylltiedig yn Ysgol Uwchradd Tregŵyr, Cecil Road, Abertawe, SA4 3DL.
Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 22ain Rhagfyr 2026. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Swit D, Llawr 1af, 220 High Street, Abertawe, SA1 1NW.
Cynhaliwyd digwyddiad ymgysylltu â'r cyhoedd ar Ddydd Mercher 2il o Ragfyr rhwng 10yb – 1yp yn Llyfrgell Tregŵyr, Stryd Mansel, Tregŵyr, Abertawe, SA4 3BU, a rhwng 3.30yp – 7yp yn Ysgol Uwchradd Tregŵyr, Cecil Road, Abertawe, SA4 3DL. Dewch draw i weld cynlluniau a delweddau o'r cynigion, trafod unrhyw ymholiadau gydag aelodau o`r tîm a rhoi sylwadau ar y cynnig.
Supporting Documents
Plans
Architectural
Location Plan
Existing Site Plan
Proposed Site Plan
Proposed Site Block Plan
Site Sections
GIFA Floor Plans
Proposed GA Floor Plans 1-2
Proposed GA Floor Plans 2-2
Building Elevations
Building Sections
Store and Compound Details
Landscape
Detailed Planting Plan
Boundary Treatment Plan
Drainage and Engineering
Proposed Drainage Layout (Overall)
Proposed Drainage Layout (Sheet 1)
Proposed Drainage Layout (Sheet 2)
Proposed Drainage Layout (Sheet 3)
Proposed Drainage Layout (Sheet 4)
Proposed Levels & Contours Sheet 1
Proposed Levels & Contours Sheet 2
Proposed Levels & Contours Sheet 3
Lighting
External Lighting LUX Plot
Reports
Planning
Planning Statement
Draft Application Form
Design and Access Statement
Design and Access Statement
Arboriculture
Arboriculture Report
Drainage and Flood Risk
Drainage Strategy
Ground Investigation
Site Investigation Report
Ecology
Preliminary Ecological Appraisal
Bat Survey
Great Crested Newt Survey
Energy
Low Zero Carbon Study
Heritage
Heritage Appraisal
Landscape and Green Infrastructure
Green Infrastructure Statement
Noise
Baseline Noise Survey Report
Transport